欄杆男專欄

欄杆男 Talum

“____ Beyond The Ranges”: The Taitung Line

AUG 31, 202639 MIN

Description

The 12-year span between 2014 and 2026 The long train intervals kept the crowd distribution just right with the electric trains dashing on the single track After 2032, short train intervals due to the dual-track construction will bring more electric trains and incur the questions that Will the diesel train be dismissed in the future? Will the just-right crowd distribution be damaged? Powered by Firstory Hosting