欄杆男專欄
欄杆男 Talum
“____ Beyond The Ranges”: The Taitung Line
AUG 31, 202639 MIN
/https://image.firstory-cdn.me/Image/ckfz87v64frm70800xldunoac/CPjdgGVL-DHGvbRv01sEK.jpg)
Description
The 12-year span between 2014 and 2026
The long train intervals kept the crowd distribution just right
with the electric trains dashing on the single track
After 2032, short train intervals due to the dual-track construction
will bring more electric trains and incur the questions that
Will the diesel train be dismissed in the future?
Will the just-right crowd distribution be damaged?
Powered by Firstory Hosting

