/https%3A%2F%2Fstorage.buzzsprout.com%2Ffddn0gpbdpp99c3jnpwqj359oh2w%3F.jpg)
Activating Curiosity® | Leading Change in the Construction Industry
Ryan Ware - AEC Industry Coach in Change Management & Leadership Development
Data Center Construction: Beyond Concrete and Steel
OCT 22, 202660 MIN
/https%3A%2F%2Fstorage.buzzsprout.com%2F9gan19lzwfqycfp2b59aojfz2kgo%3F.jpg)
Description
When we measure embodied carbon in data center construction, are we counting everything that goes inside the facility?
Energy, water, concrete, and steel are important parts of the conversation about sustainability in construction. But servers, generators, and other equipment also carry manufacturing emissions, and their replacement cycles add another layer to the carbon picture.
Stacy Smedley, Vice President at ERG, joins Ryan Ware to explore embodied carbon in data center construction and how better product data can support more informed decisions. Drawing on her work at Skanska, Building Transparency, and ERG, Stacy explains how the effort to understand building materials is expanding into the equipment that powers our digital infrastructure.
The conversation explores measurement, replacement, reuse, and the challenge of making informed choices as development accelerates. It also considers how lessons from construction can help other industries address environmental challenges through shared knowledge and collaboration.
In This Episode
How servers, generators, and equipment contribute to a data center’s carbon footprint
Why equipment replacement, reuse, and recycling matter
How EC3 helped make environmental product data more accessible
The challenge of making informed decisions under development pressure
How construction’s experience with embodied carbon can inform other industries
Chapters
00:00 – The Environmental Impact of Data Center Equipment
01:16 – Why Data Center Sustainability Matters Now
04:47 – Introducing Stacy’s Sustainability Journey
06:55 – From Architecture to Embodied Carbon
09:32 – Why Better Material Data Was Needed
12:25 – How EC3 Changed Access to Environmental Data
15:03 – Looking Beyond Concrete and Steel
19:18 – Why Data Centers Were Often Overlooked
23:34 – The Carbon Impact of Servers and Equipment
29:19 – Measuring What Goes Inside a Data Center
32:59 – Equipment Replacement, Reuse, and Recycling
38:20 – Scaling Proven Sustainability Solutions
45:34 – Applying Environmental Data Across Industries
52:50 – Closing Reflections on Curiosity
About Stacy Smedley
Stacy Smedley is Vice President at ERG (Eastern Research Group), where she leads the Product Impact Group in developing tools and data systems to understand and reduce the environmental impacts of products. She co-founded Building Transparency, the nonprofit behind the Embodied Carbon in Construction Calculator (EC3), and previously served as Director of Sustainability at Skanska USA Building.
Resources and Connections
Explore Product Impact and Register to Access Electronics/ICT Data
Learn About ERG
Explore Building Transparency and EC3
Continue Exploring
Follow Activating Curiosity® for more conversations that question familiar assumptions and explore how people across the built environment are approaching change.
Explore more episodes and resources
Emerald Built Environments
Emerald helps architects, contractors, and owners deliver energy-efficient, high-performing building
New Lyfe Accounting
Free Diagnostic ($500 value) for Activating Curiosity Listeners by NLA, to help your financial goals
Connective Consulting Group
Helping construction leaders simplify change, strengthen trust, and move forward with clarity.
Disclaimer: This post contains affiliate links. If you make a purchase, I may receive a commission at no extra cost to you.
Support the show
Have feedback or stories to share? Drop us a note or leave a VM—we’re listening!
Activating Curiosity® is proud to be featured among MillionPodcasts' top Construction Management Podcasts.
Follow Ryan at the following:
https://www.linkedin.com/in/ryankware/
https://www.linkedin.com/company/connective-consulting-group-llc
https://connectiveconsultinggrp.com/
https://connective-coaching.com/
https://ryanware.me/
Don't miss out on future episodes! Follow & subscribe now to our newsletter and stay informed about the latest trends and insights in the construction industry.
If this show helps you, please consider supporting it. Just $3/month helps cover production and keeps the conversations going.
⭐ “Love the show? Toss some stars my way, it’s the easiest applause ever.

