/https%3A%2F%2Fimage.simplecastcdn.com%2Fimages%2F5f2212c4-a4e9-4aa8-8b20-96be2329162b%2F0171a6ec-412c-469a-a9f7-f4916937e50b%2F3000x3000%2Fseason2-podcast-creative-1080x1080.jpg%3Faid%3Drss_feed)
Building Good
Jen Hancock, Geoff Capelle
The Future is Electric - with Mariko Michasiw
FEB 11, 202524 MIN
Description
Canada’s path to net zero hinges on electrification. As the world’s fourth-largest producer of hydroelectricity, we’re primed to take a global leadership role. With the provinces and territories at different stages of grid decarbonization, electrification doesn’t have to be “all or nothing” — regions with a longer way to go can take a phased approach, incorporating supplemental energy sources. But what about chilly Canadian winters? Cold-climate heat pumps now operate efficiently at -25°C. Of course, the best time to electrify may be during the initial build. But the second best time is now. Mariko Michasiw, program manager for B2E, the Building to Electrification Coalition - a program area of the Zero Emissions Innovation Centre (ZEIC) - explains how cold-climate heat pumps, strategic retrofits, and grid planning are key to scaling electrification.
Join the Building Good community today:
https://www.buildinggood.ca
LinkedIn

